HomeSituationsCorporate & Shareholder DisputesYour Licensor Threatens to Cut Off the Source Code Mid-Dispute – What Can You Do?

Your Licensor Threatens to Cut Off the Source Code Mid-Dispute – What Can You Do?

When a licensor threatens to disable API access or revoke repository credentials during an ongoing payment dispute, the licensee faces a genuinely urgent problem: the dispute mechanism itself may move far too slowly to prevent the business damage it is meant to remedy. Emergency arbitration procedures, interim injunctions from national courts, and contractually structured source-code escrow arrangements each offer a potential route to maintaining continuity – but which route is available, and how quickly it can be deployed, depends entirely on what the licence agreement and arbitration clause actually say, and on which courts have jurisdiction to assist. This article maps the legal landscape for a model situation in which a Brazilian fintech's core banking engine is licensed from a UK-based technology provider, and a certification deadline three weeks away makes the threat of disconnection existential.

Recognising the Problem: When a Licensing Dispute Becomes a Business Emergency

Technology licensing is never purely a commercial matter. When the licensed asset is a core banking engine – the system that processes transactions, communicates with payment rails, and must pass regulatory certification – every clause in the licence agreement carries operational weight that far exceeds its apparent legal significance.

The model situation described in this article is one that in-house counsel and CTOs across the fintech sector increasingly encounter: a dispute arises over licence fees or contractual performance; the licensor asserts a right to suspend or terminate access to the codebase, the API, or the hosted infrastructure; and the licensee suddenly faces the prospect that a certification, an audit, or a go-live event it has spent months preparing will collapse because of a disagreement about an invoice.

The legal problem is structurally asymmetric. The licensor typically controls the asset. The standard dispute resolution timeline – arbitration or litigation – may run for twelve to thirty-six months or longer before any final award. The business damage may be irreversible within three weeks. That asymmetry is precisely what emergency and interim relief mechanisms are designed to address. Understanding whether and how they apply in a cross-border context requires a clear-headed analysis of several interlocking questions.

What Is Really at Stake: Mapping the Risk

It is worth being explicit about the layers of risk before turning to legal remedies, because the layers are different and require different responses.

Operational continuity risk

If the licensor disables the API or withdraws credentials, the licensee loses the ability to run its core system. In the model situation, a bank partner is due to conduct a certification exercise in three weeks. Failure of that exercise because the core engine was inaccessible could trigger contractual penalties with the bank partner, loss of a certification timeline that may take months to reschedule, and reputational damage that is difficult to quantify but very real.

Intellectual property risk

Any contingency measure – attempting to replicate functionality from memory, reverse-engineering the codebase, instructing third-party developers to assist – risks stepping outside the scope of the existing licence. If the licence is subsequently found to be valid and continuing, actions taken in excess of its scope may expose the licensee to an independent IP infringement claim. This is a constraint that must be respected throughout any emergency response.

Regulatory risk

Fintech operators in Brazil are subject to oversight by the Banco Central do Brasil under the regulatory framework for payment institutions and financial technology companies established by Law No. 12,865/2013 and subsequent normative instructions. Regulatory bodies do not generally accept "our supplier cut us off" as a sufficient explanation for a failure of operational resilience. Business continuity obligations exist independently of the contractual dispute.

Arbitration risk

If the licensee has already sent a notice of critical dependency and offered to continue paying the uncontested portion of fees, it has taken a sensible preliminary step – but it must be careful not to take any action that could be characterised as a breach of the arbitration clause, an anticipatory repudiation, or a unilateral modification of contractual obligations. Every step from this point forward should be documented and legally reviewed before it is taken.

If you are facing a situation with this structure and need a rapid diagnostic of your contractual position, the team at Ferraz & Whitmore can assist. Write to info@ferrazwhitmore.com or visit our contacts page.

The Legal Fork: Three Questions That Determine Your Options

Before committing to any procedural route, three threshold questions must be answered by reference to the actual documents.

Question 1: What does the arbitration clause say about emergency relief?

The major institutional arbitration rules each contain provisions for emergency arbitration, but the precise scope of those provisions varies and is not uniform.

  • The ICC Rules of Arbitration (2021), Article 29 and Appendix V, provide for an Emergency Arbitrator procedure. A party may apply before the constitution of the arbitral tribunal. The Emergency Arbitrator may order interim or conservatory measures. Critically, the procedure applies only if the parties have agreed to the ICC Rules on or after 1 January 2012 and have not opted out of Article 29. The Emergency Arbitrator has no power to order measures against third parties – including, in principle, an independent escrow agent who is not a party to the arbitration agreement.
  • The LCIA Rules (2020), Article 9B, similarly provide for the appointment of an Emergency Arbitrator. The same structural limitation applies: the Emergency Arbitrator's jurisdiction is confined to the parties to the arbitration agreement.
  • The UNCITRAL Arbitration Rules (2013) do not contain an emergency arbitrator procedure in the same form. Under Article 26, an arbitral tribunal already constituted may grant interim measures, but there is no equivalent pre-constitution emergency mechanism in the standard rules themselves – though some administering institutions have added one.

If the licence agreement specifies ad hoc arbitration under UNCITRAL rules without an institutional emergency procedure, the emergency arbitration route may simply not be available until a tribunal is constituted, which typically takes weeks.

Question 2: Which national court has jurisdiction to grant interim relief in support of arbitration?

Even where parties have agreed to arbitrate, most legal systems preserve the right of a party to seek interim relief from a national court, particularly where the relief is needed urgently and before or during arbitral proceedings. The seat of arbitration and the place of enforcement are both relevant.

  • In England and Wales, Section 44 of the Arbitration Act 1996 gives the court power to grant interim injunctions in support of arbitral proceedings, including where the case is urgent and the tribunal has not yet been constituted. The English courts have a well-developed body of case law on the American Cyanamid balance-of-convenience test for interim injunctions, and applications can be made on short notice or without notice in genuinely urgent cases.
  • In Brazil, the Arbitration Act (Law No. 9,307/1996, as amended by Law No. 13,129/2015) expressly provides in Article 22-A that a party may request urgent interim measures from the Brazilian courts before or during arbitral proceedings. The court's role is to preserve the status quo pending arbitration, not to decide the merits. Brazilian courts may also enforce interim measures ordered by an arbitral tribunal seated abroad, subject to the conditions of the New York Convention as applied in Brazilian practice.

Question 3: Does the contract contain a service continuity covenant or escrow trigger?

Many enterprise software licences, particularly those used as core banking infrastructure, include provisions that specifically address the risk of licensor insolvency or refusal to perform: source-code escrow arrangements, service level agreements with explicit continuity obligations, and covenants that restrict the licensor's right to suspend access pending resolution of a disputed invoice. If those provisions exist, they may provide a faster and less costly path to continuity than emergency arbitration or interim injunction – and they should be the first thing checked in the contract.

Realistic Routes: Options, Conditions, and Trade-offs

Route A: Negotiated standstill with monitored escrow activation

If the dispute is genuinely about the quantum of fees rather than the fundamental validity of the licence, there may be room for a temporary standstill agreement: the licensee continues to pay the uncontested portion of fees; the licensor agrees not to suspend access while the disputed amount is resolved; and the terms of the standstill are documented in a written agreement that also sets out what happens to the escrow if the standstill breaks down.

Conditions: Both parties must be willing to negotiate in good faith. The licensor must have a commercial incentive to reach a standstill – which may exist if the licensor also faces reputational or contractual consequences from a sudden suspension.

Advantages: Fastest route to certainty; least expensive; preserves the relationship; avoids the risk that interim relief is refused or delayed.

Disadvantages: The licensor is under no legal obligation to agree. If the licensor has already stated an intention to disconnect, a standstill negotiation may simply waste critical days. The standstill agreement itself must be drafted carefully to avoid inadvertently waiving any rights in the main dispute.

Route B: Emergency arbitration or urgent court application

If negotiation fails or is not viable, the licensee should assess whether it can seek emergency relief from an arbitral institution or a national court.

Emergency arbitration under ICC or LCIA rules: An application to the ICC or LCIA for an Emergency Arbitrator can typically be filed within hours of a decision to proceed. Under the ICC Rules, the institution must appoint the Emergency Arbitrator within two days of receiving the application; the Emergency Arbitrator must then establish a procedural timetable and render an order within fifteen days of receipt of the file (extendable to thirty days with consent or in exceptional circumstances). The order can require the licensor to maintain access pending constitution of the main tribunal.

Court application in England and Wales under Section 44: Where the seat of arbitration is in England, an urgent application to the High Court under Section 44 of the Arbitration Act 1996 can produce an interim injunction within days or, in a true emergency, within hours. The applicant must satisfy the American Cyanamid test: there is a serious question to be tried; damages would not be an adequate remedy; and the balance of convenience favours the grant of relief. For a fintech facing imminent loss of a certification deadline, the adequacy-of-damages question may well favour the applicant – financial loss from a failed certification may be very difficult to quantify and may not fully compensate the harm.

Court application in Brazil: An application to the Brazilian courts under Article 22-A of Law No. 9,307/1996 is an alternative or supplementary route where the licensor or the relevant infrastructure has a presence in Brazil. Brazilian procedural law permits urgent interim measures (tutela de urgência) under Articles 300–310 of the Code of Civil Procedure (Law No. 13,105/2015), which requires the applicant to demonstrate the probability of the right claimed and the risk of irreparable harm or the risk of inefficacy of the final judgment.

Key limitation of both routes: An emergency arbitrator or a court granting relief in support of arbitration can order the licensor to maintain access. Neither can directly compel an independent third-party escrow agent who is not a party to the dispute. If the escrow release mechanism depends on a trigger that the licensor disputes, a separate application or contractual analysis may be needed.

Route C: Contingency migration within licence scope

Independently of litigation strategy, the licensee's technical team should prepare – but not yet execute – a contingency migration plan. The plan must be scoped strictly within what the licence permits: use of the licensor's code only to the extent authorised, no reverse-engineering beyond what applicable law permits (which under UK copyright law may be limited to the decompilation permitted by Section 50B of the Copyright, Designs and Patents Act 1988, and in Brazil under Article 75 of Law No. 9,610/1998), and no disclosure of the licensor's confidential information to third-party contractors unless the licence expressly permits it.

The purpose of preparing the plan now is not to execute it unilaterally, but to understand the technical options before the deadline, and to ensure that if escrow is triggered or interim relief is obtained, the technical team is ready to act quickly.

Route Likely timeline to relief Key precondition Main risk
A – Negotiated standstill Days (if licensor cooperative) Licensor willing to engage Licensor may refuse; time lost
B1 – ICC/LCIA Emergency Arbitrator 2–15 days (order); longer to enforce Institutional arbitration clause, no opt-out Order may not bind escrow agent; enforcement varies
B2 – English court (s.44) Days to 1–2 weeks Seat in England; serious question; balance of convenience Undertaking in damages required; may be refused
B3 – Brazilian court (tutela de urgência) Days to 2 weeks Licensor/infrastructure presence in Brazil; Art. 300 CPC conditions met Jurisdictional challenge; coordination with main arbitration
C – Contingency migration plan Preparation: immediate; execution: depends on trigger Strictly within licence scope IP infringement if scope exceeded

Typical Mistakes and What Cannot Be Promised

Mistakes that make the situation worse

  • Acting outside the licence scope without legal authorisation. Instructing developers to copy, adapt, or reverse-engineer the code beyond what the licence and applicable law expressly permit creates independent liability and weakens the licensee's position in the main dispute.
  • Delaying the first legal step while trying to manage the relationship. In a situation with a three-week deadline, every day without a legal filing or a signed standstill agreement is a day lost. Relationship management and legal action are not mutually exclusive.
  • Assuming the arbitration clause covers emergency relief. Many arbitration clauses in commercial technology agreements were drafted before institutional emergency arbitrator procedures existed, or were adapted from templates that pre-date those rules. The clause must be read carefully. An ad hoc clause or a clause specifying rules that do not include emergency procedures may leave the emergency arbitrator route unavailable.
  • Treating the escrow agreement as self-executing. Source-code escrow agreements typically require a formal trigger notice and may require the escrow agent to satisfy itself that the trigger conditions are met. If the licensor disputes the trigger, the escrow agent may decline to release the code pending resolution – which may itself require a court application.
  • Withholding all payment as leverage. If the licensor has a contractual right to suspend for non-payment, withholding even the uncontested portion of fees could validate the suspension. The notice sent in this model situation – offering to continue paying the uncontested portion – is the correct instinct. It should be formalised in writing and the payment should actually be made.

What cannot be promised

No legal adviser can guarantee that an emergency arbitrator or a court will grant interim relief. The outcome depends on the specific facts, the terms of the agreement, the evidence presented, and the discretion of the decision-maker. It is equally possible that a court refuses an application on the grounds that damages would be an adequate remedy, or that an emergency arbitrator concludes that the licensor's right to suspend is contractually clear. Preparing for that possibility – including the contingency migration plan – is not pessimism; it is due diligence.

Similarly, even a successful interim relief application does not resolve the underlying dispute. It preserves the status quo while the arbitration proceeds. The licensee will still need to address the substantive merits of the payment dispute, and the costs of the interim relief application will form part of the overall dispute budget.

Documents and Evidence: What to Gather Now

The strength of any emergency relief application depends on the quality of the evidence assembled. The following documents should be located and reviewed without alteration or deletion before any further steps are taken.

  • The licence agreement in its final executed form, including all schedules, exhibits, and any amendments or side letters. Pay particular attention to: the scope of the licence; the licensor's rights to suspend or terminate; the dispute resolution clause; any service continuity covenant; and any escrow provisions.
  • The source-code escrow agreement, if one exists: the identity of the escrow agent; the trigger conditions for release; the notice requirements; and any provisions restricting how the released code may be used.
  • The service level agreement: the licensor's uptime and availability commitments; the remedies for breach; and any force majeure or exclusion clauses.
  • API access logs: evidence of uninterrupted access up to the date of the dispute; any anomalies or degradations in service; timestamps that corroborate the timeline.
  • Correspondence: all written communications relating to the payment dispute; the licensor's threat to suspend; and the notice of critical dependency already sent. These should be preserved in their original form with metadata intact.
  • The certification schedule: the bank partner's certification timeline; the contractual obligations between the licensee and the bank partner; evidence of the deadlines and consequences of failure.
  • Payment records: evidence of amounts paid and the basis for any disputed amounts; invoices; bank statements confirming actual payments.
  • Business continuity plan: if one exists, it should be located. If one does not exist, the absence may be relevant to regulatory obligations.
  • Corporate authorisations: confirm that the individuals who executed the licence agreement had authority to do so, and that any notices already sent were signed by authorised representatives.

The first step, regardless of which procedural route is ultimately chosen, is to compile this document package without editing any primary evidence, to prepare a chronology of events, and to review notice requirements and limitation periods under the applicable law. These steps must be taken now.

Timeline and Cost Drivers

In any emergency legal situation, the cost of action is best evaluated against the cost of inaction – in this case, a failed certification, potential regulatory scrutiny, and the loss of the bank partnership that the certification was meant to secure.

The key timeline drivers in this model situation are:

  • Three weeks to certification. This is the hard deadline that structures everything. Any route that cannot produce relief within two to two-and-a-half weeks is effectively unavailable.
  • Notice requirements in the arbitration clause. Some arbitration clauses require a cooling-off period or mediation attempt before arbitration can commence. If the clause requires, say, fourteen days' notice before filing, that period has already started running from the notice of critical dependency – or it has not started running at all if that notice was not structured as a formal dispute notice. This needs to be checked immediately.
  • Emergency arbitrator fees. ICC emergency arbitrator proceedings involve institution fees and arbitrator fees established by the ICC's current scale (available on the ICC website). LCIA emergency proceedings involve fees under the LCIA's Schedule of Costs. These are significant but are likely modest relative to the business cost of the certification failure.
  • Undertaking in damages. An English court granting an interim injunction will ordinarily require the applicant to give a cross-undertaking in damages – a commitment to compensate the other party if the injunction is later found to have been wrongly granted. The applicant should understand this obligation and assess its exposure.
  • Local legal representation. Applications to the English High Court require solicitors and, in many cases, counsel authorised to appear in those courts. Applications to Brazilian courts require Brazilian-qualified lawyers. These costs are real and should be budgeted from the outset. Coordination between cross-border legal teams adds time and requires careful management.

Decision Checklist

The following checklist is designed for in-house teams working through this situation in the first 48–72 hours.

  • Read the arbitration clause in full: does it specify institutional rules (ICC, LCIA, or other)? Does it include an emergency arbitrator procedure or exclude it? Is there a cooling-off or mediation requirement?
  • Read the licence agreement's suspension and termination provisions: what grounds does the licensor need to invoke a suspension? Has it complied with any notice requirements that those provisions specify?
  • Check whether a source-code escrow agreement exists and, if so, whether the trigger conditions are currently met or could be triggered.
  • Confirm that the uncontested portion of fees has been paid and that written evidence of the payment exists.
  • Confirm that the notice of critical dependency was sent by an authorised representative and preserved in a form that can be used as evidence.
  • Identify the seat of arbitration and the governing law of the licence agreement: these determine which court can grant Section 44 relief and which substantive law governs the licence obligations.
  • Identify whether the licensor or any infrastructure it controls has a legal presence in Brazil: this is relevant to whether a Brazilian interim application would be effective.
  • Brief your bank partner on the situation: they may have contractual rights of their own, and early communication is preferable to a last-minute notification that the certification cannot proceed.
  • Engage cross-border legal counsel immediately: the analysis in items 1–7 requires qualified lawyers in the relevant jurisdictions, and the time available does not permit a staged approach.
  • Prepare but do not execute the contingency migration plan: know your technical options without taking any step that could be characterised as a licence breach.

Ferraz & Whitmore can assist with the preliminary documentary diagnostic and the coordination of this cross-border analysis, working alongside licensed local lawyers in Brazil and England as appropriate. To discuss your situation, write to info@ferrazwhitmore.com or visit our contacts page.

The Cross-Border Dimension: Brazil and England Working Together

A recurring feature of cross-border technology licence disputes is that the legal tools available in one jurisdiction interact imperfectly with the tools available in another. Some specific interaction points are worth noting for this model situation.

Enforcement of emergency arbitral orders across borders

An order made by an ICC or LCIA Emergency Arbitrator is not automatically enforceable as an arbitral award in the same way as a final award under the New York Convention on the Recognition and Enforcement of Foreign Arbitral Awards. The Convention, to which both Brazil and the United Kingdom are parties, applies to arbitral awards – but whether an emergency order qualifies as an "award" for Convention purposes has been treated differently by courts in different jurisdictions. Some courts have treated emergency orders as enforceable interim measures; others have required a separate court application. This uncertainty is one reason why a parallel or alternative national court application may be prudent.

Coordination between English and Brazilian proceedings

If interim relief is sought in both jurisdictions simultaneously, there is a risk of inconsistent orders or of the licensor arguing that one set of proceedings is an abuse of process. The approach requires careful sequencing: typically, the arbitral seat's court is the primary forum for relief in support of the arbitration, with the courts of the place of enforcement or the place where the licensor has assets as a secondary or alternative forum. This sequencing should be agreed between the cross-border legal teams before any application is filed.

Brazilian regulatory dimension

The Banco Central do Brasil's regulatory framework for payment institutions includes expectations around operational resilience and business continuity. If the licensee is a regulated payment institution or fintech operating under Law No. 12,865/2013, it may have reporting obligations if its core system is at risk of interruption. Early consultation with Brazilian regulatory counsel on this point is advisable.

If you need to map the procedural options across both jurisdictions as a matter of urgency, please contact Ferraz & Whitmore at info@ferrazwhitmore.com.

Sources

Disclaimer: This article describes a model client situation for informational purposes only and does not constitute legal advice, nor does it reflect an actual Ferraz & Whitmore engagement or outcome. Legal routes are described as options, not guarantees. Applicable law, procedure and the right to provide a given service in each jurisdiction must be confirmed for any specific matter. Ferraz & Whitmore is an independent legal advisory firm based in Lisbon, Portugal; where local representation is required, it works with licensed local counsel. For advice on your situation, contact info@ferrazwhitmore.com.

Reviewed by
Legal Analyst · IP & AI Law