When a French pharmaceutical manufacturer accepts delivery of active pharmaceutical ingredient (API), incorporates part of that material into production, and then raises a documentation objection 90 days later to avoid paying €620,000, the supplier faces a compound problem: a contested commercial debt, a regulatory dimension that cannot be ignored, and a buyer who controls access to the physical evidence. The legal path forward requires separating what is genuinely in dispute on quality grounds from what amounts to a retention of payment that is difficult to justify once the material has entered the production chain. With the right contractual, regulatory, and evidentiary strategy, an Indian API supplier can pursue recovery without conceding ground it has not lost.
Recognising the Situation
Commercial directors at Indian API exporters will recognise this pattern immediately. A registered active substance is shipped against agreed specifications. The buyer receives, inspects, and – critically – uses part or all of the consignment in its manufacturing process. Weeks or months later, an objection surfaces: a batch record is said to be incomplete, a certificate of analysis is queried, or a standard operating procedure is alleged not to have been followed. The entire invoice is withheld, not merely the value attributable to the allegedly deficient batch.
The leverage in this situation flows almost entirely from asymmetry. The buyer holds the goods (or has consumed them), holds the production records showing how and when the material was used, and controls access to its own quality assurance infrastructure. The seller, sitting in Mumbai or Hyderabad, has only the documentation it shipped and the correspondence that followed. This asymmetry makes early, disciplined evidence management the single most important factor in whether recovery is ultimately possible.
This is a model situation drawn from the type of cross-border pharmaceutical supply disputes that Ferraz & Whitmore advises on. It is not a report of a specific client matter or outcome.
What Is Really at Stake
The immediate financial exposure is the €620,000 invoice. But several other interests compound the commercial risk:
- Regulatory reputation: A formal quality rejection by a European manufacturer, if it escalates to the competent authority – in France, the Agence nationale de sécurité du médicament et des produits de santé (ANSM) – can trigger an inspection or a request for a corrective and preventive action (CAPA) report. Even if the rejection is ultimately found to be commercially motivated, an unresolved quality query on file can complicate future Drug Master File (DMF) registrations and supply agreements with other EU buyers.
- Contractual relationship: Many API supply agreements contain exclusivity provisions, minimum volume commitments, or renewal options. Allowing an unjustified rejection to stand unchallenged can set a precedent that distorts the entire commercial relationship going forward.
- Proof of conformity: The window for independent testing of retained samples is not unlimited. Under GMP requirements applicable in the EU, the holder of a manufacturing authorisation must retain reference and retention samples for a period specified by regulation. If the Indian supplier does not act promptly to secure independent access to those samples, the evidential record may become permanently incomplete.
- Currency and financing risk: An unresolved receivable of this size affects working capital, export credit insurance coverage, and banking relationships. At Indian export volumes of USD 18 million, a single contested invoice of this magnitude represents a material proportion of receivables.
If you are facing a similar situation and would like a preliminary assessment, please write to info@ferrazwhitmore.com or visit our contact page.
The Legal Fork: Applicable Law, Jurisdiction, and Regulatory Overlay
Governing Law and the CISG
An India–France API supply agreement will almost certainly fall within the scope of the United Nations Convention on Contracts for the International Sale of Goods (CISG), to which both India and France are contracting states. Under CISG Article 38, the buyer must examine the goods – or cause them to be examined – within as short a period as practicable in the circumstances. Under CISG Article 39, the buyer loses the right to rely on a lack of conformity if it does not give notice to the seller within a reasonable time after it discovered or ought to have discovered the defect, and in any event within two years of the date on which the goods were actually handed over.
The 90-day gap between delivery and the rejection notice is therefore significant. A notice raised after the buyer has already used part of the consignment in production, without any contemporaneous record of objection at receipt, is difficult to characterise as timely under Article 38. The buyer's argument will be that the defect was latent – discoverable only through detailed documentation review – but that argument is harder to sustain for a documentation objection, which could have been raised at the moment the batch records were received alongside the shipment.
If the contract contains an express governing law clause selecting French law, the analysis shifts. The French Civil Code governs obligations between parties and sets its own regime for conformity and rejection. Under French law the rules on vices cachés (hidden defects) and conformity of goods sold are distinct from those under the CISG, and the limitation periods differ. In any cross-border pharmaceutical dispute, the first analytical step is to determine whether the CISG applies by default or has been excluded, and whether French or Indian substantive law governs any residual matters not covered by the CISG.
Jurisdiction and Dispute Resolution
If the agreement contains an arbitration clause – common in international pharmaceutical supply contracts – the seat and institutional rules determine the procedural options. Paris is a frequent seat for ICC arbitration in European-seated commercial disputes; the ICC Court of Arbitration, headquartered in Paris, administers cases under its Rules. If there is no arbitration clause, jurisdiction in France will follow the rules of EU Regulation 1215/2012 (Brussels I Recast) as applied by French courts after the contract between parties not both domiciled in EU Member States; in that scenario, the agreed forum clause in the contract, if any, is determinative. Where there is no forum clause, the defendant's domicile (France) would typically ground jurisdiction in French courts.
India is a signatory to the New York Convention on the Recognition and Enforcement of Foreign Arbitral Awards (1958). France is also a signatory. An arbitral award rendered in Paris or another New York Convention seat would, in principle, be enforceable in India, and an award rendered in an India-seated arbitration would be enforceable in France, subject to the procedural conditions of each jurisdiction. This matters because, depending on where the buyer's assets are located, the enforcement geography drives the choice of forum.
The Regulatory Overlay
Pharmaceutical supply in the EU is governed by Directive 2001/83/EC (the Community code relating to medicinal products for human use) and the Good Manufacturing Practice guidelines issued under it (EudraLex Volume 4). The French manufacturer, as a holder of a manufacturing authorisation under Article 40 of Directive 2001/83/EC, is obliged to ensure that the APIs it uses comply with GMP. It is also required to conduct audits of its API suppliers and to have a written Quality Assurance Agreement (QAA) in place.
This regulatory framework cuts both ways. The buyer cannot simply assert a documentation deficiency and treat the matter as closed: GMP requires documented decisions, root cause analysis, and a formal deviation or non-conformance report. If the buyer genuinely believed the documentation was deficient, it was obliged to quarantine the material, raise a formal deviation record, and notify the qualified person (QP) responsible for batch release. The fact that the material was used in production without an apparent contemporaneous quarantine decision is itself a significant regulatory data point – one that the Indian supplier should seek to establish through correspondence and document requests.
Conversely, the Indian supplier, as an API manufacturer supplying to EU-regulated entities, is likely itself subject to EU GMP requirements for APIs (EudraLex Volume 4, Part II, based on the ICH Q7 guideline). Any technical response to the buyer's objection must be framed in GMP-compliant language, with reference to actual batch records, out-of-specification (OOS) investigation protocols, and the supplier's internal deviation management system.
Realistic Routes and Their Trade-Offs
Route A – Independent Expert Protocol on the Disputed Batch
The most technically credible response is to propose a jointly agreed independent expert analysis of the disputed batch, using retained reference and retention samples held by the buyer under GMP obligations. The protocol should specify: the identity and credentials of the expert laboratory (ideally accredited under ISO/IEC 17025); the testing parameters to be applied; the chain of custody procedures for sample transfer; and the agreed evidentiary weight to be given to the results.
Advantages: If the analysis confirms conformity, the supplier has a technically unassailable record. If it reveals a genuine deficiency, the supplier knows the actual scope of its exposure before litigation, which limits reputational and financial risk.
Disadvantages: The buyer is currently refusing access to its facility. Compelling sample disclosure requires either contractual authority (many QAAs include a provision for this) or court-ordered interim relief. Interim relief in France – référé proceedings before the juge des référés – can be obtained relatively quickly where the applicant demonstrates urgence and the absence of contestation sérieuse, but it requires local representation by a licensed French lawyer (avocat). Ferraz & Whitmore works with licensed local counsel in France for such proceedings.
Route B – Segregation of Undisputed Batches and Partial Settlement
Where a single documentation objection has been used as the lever to withhold payment for an entire shipment comprising multiple batches or delivery orders, the supplier should formally demand segregation. Under CISG Article 51, if the seller delivers only part of the goods or if only part is in conformity, the provisions of Articles 46 to 50 apply in respect of the missing or non-conforming part. This means the buyer's rights of rejection, price reduction, or damages are limited to the part actually in defect; it cannot withhold payment for the conforming balance.
A written demand for partial payment of the uncontested batches, with a clear reservation of rights as to the disputed batch, serves two purposes: it crystallises the actual scope of the dispute and creates a document trail demonstrating that the supplier is acting in good faith while not conceding the quality objection.
Advantages: Reduces the financial exposure rapidly; demonstrates reasonableness that is relevant if proceedings follow.
Disadvantages: Partial acceptance of payment could, if poorly documented, be construed as a settlement of the entire claim. Any partial payment arrangement must be supported by an express written reservation of the right to pursue the balance.
Route C – Arbitration or Litigation After Technical Analysis
If Routes A and B do not produce a resolution, formal proceedings become necessary. The choice between arbitration and litigation depends on the contract, the seat options available, and the enforcement geography. For a dispute of €620,000 with a buyer in France and a seller in India, ICC arbitration seated in Paris is a commercially sensible option where the contract provides for it: the award is enforceable in both jurisdictions under the New York Convention, the proceedings are confidential, and pharmaceutical sector expertise can be incorporated through the choice of arbitrators.
If the contract provides for litigation in French courts, the Tribunal de commerce (commercial court) has jurisdiction over commercial disputes between traders. French commercial courts can appoint a court-expert (expert judiciaire) to analyse technical questions, and interim attachment of assets (saisie conservatoire) is available where the creditor can demonstrate a principle of a claim and circumstances justifying urgency.
Advantages of arbitration: Confidentiality protects the supplier's regulatory reputation; arbitrators with pharmaceutical expertise can be selected; New York Convention enforcement is straightforward.
Advantages of litigation: French courts have coercive power over a French-domiciled defendant; interim asset freezes are available on a relatively summary basis; no agreement to arbitrate is required.
Disadvantages: Both routes involve cost and time. Arbitration, while confidential, is expensive at the case management level. French commercial litigation, while procedurally efficient, requires local avocat representation and can extend over 18 to 36 months at first instance for a technically complex case.
| Route | Speed | Cost level | Regulatory risk | Enforcement |
|---|---|---|---|---|
| A – Independent expert protocol | Medium (sample access may require court order) | Low–medium | Low if managed carefully | N/A – pre-litigation |
| B – Segregation and partial payment demand | Fast (immediate written demand) | Low | Low | N/A – pre-litigation |
| C – ICC Arbitration (Paris) | 12–24 months typical | High | Low (confidential) | New York Convention – India and France |
| C – French commercial litigation | 18–36 months at first instance | Medium–high | Medium (public record) | EU–India bilateral enforcement |
Typical Mistakes and What Cannot Be Promised
Mistakes to Avoid
- Treating the rejection as a purely commercial dispute. The GMP dimension is real. Any supplier response that ignores regulatory language, dismisses the documentation concern without technical rebuttal, or concedes a quality failure without laboratory evidence creates a record that can be used against the supplier in regulatory proceedings and in litigation. Every communication with the buyer's quality assurance team should be treated as a potential exhibit.
- Inferring acceptance from use in production. The fact that the buyer incorporated the API into its production process is powerful evidence that the material was not genuinely quarantined as defective at the time of receipt. However, this inference must be established through contemporaneous records – the buyer's batch manufacturing records, their qualified person's release decisions, and their internal deviation logs. The supplier should not simply assert this inference; it must build the evidentiary record to support it, ideally through formal requests for disclosure backed by contractual rights under the QAA.
- Sending additional documentation without a clear reservation. The supplier has already sent new documentation to the buyer's quality department. This is not inherently wrong, but it should not be framed as an admission that the original documentation was deficient. All supplementary documentation should be accompanied by a written statement that it is provided without prejudice to the supplier's position that the original batch records were compliant with the agreed specifications and applicable GMP requirements.
- Delaying action on the samples. Reference and retention samples held by the buyer have a shelf life and a GMP-defined retention period. If those samples are destroyed or degraded before independent testing is conducted, the supplier may lose its most important piece of physical evidence. An immediate written request to preserve all retained samples, with explicit reference to the QAA and to the EU GMP retention obligations, should be sent without delay.
- Conflating documentation deficiency with substance deficiency. A missing signature on a batch record, a certificate of analysis that uses a slightly different test method nomenclature, or an SOP reference that has been updated since the supply agreement was signed are documentation issues. They are not, by themselves, evidence that the substance itself was out of specification. Keeping these two categories analytically distinct in every communication is essential.
What Cannot Be Promised
No legal adviser can guarantee recovery of a contested commercial invoice. The outcome depends on the terms of the specific contract, the content of the quality assurance agreement, the batch records and testing results, the jurisdiction of the dispute resolution clause, and the credibility of the expert evidence. What experienced advisers can do is structure the approach to maximise the evidentiary foundation, minimise regulatory collateral damage, and present the strongest possible case in the chosen forum.
Key Documents and Evidence
The following documents are essential to any technical and legal assessment of this situation:
- Certificate of Analysis (CoA) for each batch delivered, signed by the quality control manager and cross-referenced to the agreed specification.
- Quality Assurance Agreement (QAA) between the supplier and the buyer, specifying the agreed specifications, the rejection procedure, notice periods, and the arrangements for independent testing.
- Batch manufacturing records and batch records from the Indian supplier's site, demonstrating GMP-compliant production and in-process controls.
- Delivery records and customs documentation (airway bill, packing list, CMR or sea waybill, customs entry at the French border), establishing the date of physical delivery.
- Proof of receipt and use: any acknowledgement by the buyer of receipt; production records or batch manufacturing records from the French site showing consumption of the API (obtainable through disclosure or court-ordered expert access).
- Quality deviation or non-conformance reports from the buyer, if any were formally raised at the time of receipt – or, significantly, evidence of the absence of such reports.
- Sample chain documentation: records identifying the reference and retention samples held at the French facility, their location, storage conditions, and remaining quantity.
- Correspondence record: all emails, formal letters, and meeting notes between the two parties' quality and commercial teams from the date of shipment to the date of refusal.
- GMP compliance documentation: the supplier's current GMP certificate (issued by the Indian Central Drugs Standard Control Organisation (CDSCO) or by an EU-recognised inspection authority), and any EU GDP/GMP audit reports conducted by the buyer or its affiliates.
Timeline and Cost Drivers
The timeline for resolving a dispute of this nature depends heavily on which route is pursued and how quickly the evidentiary record can be assembled. The following indicative phases apply:
- Immediate (days 1–14): Formal written demand for sample preservation; request for segregation of uncontested batches; written reservation of rights on the disputed documentation objection; instruction of local French counsel to advise on référé proceedings if access to samples is denied.
- Short term (weeks 2–8): Contractual and regulatory review of the QAA, agreed specifications, and batch records; preparation of a technical position paper; approach to an ISO/IEC 17025-accredited independent laboratory; formal demand for partial payment of uncontested batches.
- Medium term (months 2–6): Independent expert testing, if samples become available; technical report; formal settlement discussions on the basis of expert results; if no resolution, preparation of arbitration request or court claim.
- Formal proceedings (months 6–24+): Arbitration or litigation as appropriate; potential interim relief applications; enforcement if award or judgment obtained.
The principal cost drivers are: the need for ISO/IEC 17025-accredited expert testing; local French legal representation (which is mandatory before French courts and strongly advisable in ICC proceedings); document translation (batch records, GMP documentation, and correspondence will need to be available in both English and French); and the complexity of the GMP regulatory analysis, which requires specialist pharmaceutical regulatory input alongside legal advice.
To discuss how this type of analysis could apply to your situation, contact us at info@ferrazwhitmore.com or through our contacts page.
Decision Checklist
- ▢ Confirm whether the CISG applies or whether it has been excluded by the governing law clause.
- ▢ Identify the dispute resolution clause: arbitration (seat, rules) or litigation (jurisdiction).
- ▢ Locate and review the Quality Assurance Agreement and the agreed specification for each batch.
- ▢ Confirm the date of physical delivery and the date of the first formal rejection notice: calculate whether the 90-day gap is consistent with the CISG Article 38/39 requirements or the contractual rejection procedure.
- ▢ Send an immediate written request for sample preservation, citing GMP retention obligations and the QAA.
- ▢ Identify which batches are genuinely contested and which are not; prepare a formal demand for partial payment of uncontested batches with an express reservation of rights.
- ▢ Instruct local French counsel to advise on référé proceedings and interim asset preservation.
- ▢ Identify an ISO/IEC 17025-accredited independent laboratory capable of testing the API against the agreed specification.
- ▢ Review all outgoing communications from the quality team to ensure they do not inadvertently concede a quality defect without laboratory support.
- ▢ Confirm the supplier's current GMP certificate status with CDSCO and any EU-recognised inspection authority.
- ▢ Assess ANSM notification risk: whether the buyer has or is likely to file a formal quality complaint with the French competent authority, and whether a proactive regulatory communication strategy is warranted.
- ▢ Instruct an independent pharmaceutical regulatory expert to review the documentation package and prepare a technical position paper before any formal proceedings are commenced.
Ferraz & Whitmore coordinates cross-border pharmaceutical supply disputes of this nature, working alongside licensed local lawyers and independent expert witnesses. If this situation resembles yours, write to info@ferrazwhitmore.com or visit our contacts page to arrange an initial consultation.
Sources
- UNCITRAL – United Nations Convention on Contracts for the International Sale of Goods (CISG) – Articles 38, 39, and 51 on buyer's examination obligations, timely notice of non-conformity, and partial non-conformity; retrieved 2026
- UN Treaty Collection – New York Convention on the Recognition and Enforcement of Foreign Arbitral Awards, 1958 – contracting states list confirming India and France as signatories; retrieved 2026
- EUR-Lex – Regulation (EU) No 1215/2012 (Brussels I Recast) – jurisdiction rules for civil and commercial matters; retrieved 2026
- EUR-Lex – Directive 2001/83/EC on the Community code relating to medicinal products for human use – Article 40 (manufacturing authorisation), Article 46 (obligations of manufacturers), and API supplier qualification requirements; retrieved 2026
- European Commission – EudraLex Volume 4, Part II: GMP for Active Substances used as Starting Materials – based on ICH Q7; GMP obligations for API manufacturers supplying EU-regulated manufacturers; retrieved 2026
- European Commission – EudraLex Volume 4, Annex 11 (Computerised Systems) – data integrity requirements relevant to batch record documentation; retrieved 2026
- ANSM – Agence nationale de sécurité du médicament et des produits de santé: missions and competences – French national competent authority for medicinal products; GMP inspection and quality complaint functions; retrieved 2026
- CDSCO – Central Drugs Standard Control Organisation: Good Manufacturing Practices – Indian GMP certification framework for pharmaceutical manufacturers; retrieved 2026
- ICC Court of Arbitration – 2021 Arbitration Rules – institutional rules applicable to ICC arbitration proceedings; retrieved 2026
- ISO/IEC 17025:2017 – General requirements for the competence of testing and calibration laboratories – accreditation standard for independent expert laboratories; retrieved 2026
Disclaimer: This article describes a model client situation for informational purposes only and does not constitute legal advice, nor does it reflect an actual Ferraz & Whitmore engagement or outcome. Legal routes are described as options, not guarantees. Applicable law, procedure and the right to provide a given service in each jurisdiction must be confirmed for any specific matter. Ferraz & Whitmore is an independent legal advisory firm based in Lisbon, Portugal; where local representation is required, it works with licensed local counsel. For advice on your situation, contact info@ferrazwhitmore.com.