When a state-owned enterprise (SOE) suspends payments on a large infrastructure contract and the government disavows any direct obligation, the contractor faces a legally distinct problem: the entity that contracted is not the sovereign, and the sovereign that presented the project as "government-backed" may have made no binding commitment. The viable paths forward depend entirely on whether any documentary guarantee exists, what it actually says, and what dispute-resolution mechanism the contract provides against the SOE itself. Acting without that analysis – for instance, by writing letters to a ministry that is not a party to the contract – wastes time and may inadvertently prejudice the creditor's position.
The Recognisable Problem: When "Government-Backed" Turns Out to Mean Nothing Legally Binding
Infrastructure contractors regularly encounter a particular commercial mismatch. During tender and procurement, a project is presented by its sponsors – often a government ministry or a development bank – with language suggesting state commitment: slide decks, information memoranda, and government officials speaking at signing ceremonies. The contract itself, however, is executed with a specialised SOE, a public utility company, or a government-owned project vehicle. The assumption that the state stands behind the obligation is commercially reasonable but legally untested until something goes wrong.
In this model scenario, the contractor completed milestone work and submitted payment certificates for approximately US $9 million. Following a government budget suspension, the SOE refused acceptance of the milestone and withheld payment. When the contractor escalated to the relevant ministry, the response was clear: the ministry is not a party to the contract and does not consider itself bound by any payment obligation.
This is not unusual. A state-owned enterprise is, in most legal systems, a separate legal person. It has its own balance sheet, its own directors, and its own contractual capacity. Its shares may be owned entirely by the state, but that ownership does not automatically cause the state to inherit the SOE's debts, nor does it expose sovereign assets to enforcement proceedings arising from the SOE's obligations. This distinction – between state ownership of an entity and state liability for that entity's debts – is the central legal problem here.
What Is Really at Stake
The practical stakes extend well beyond the unpaid milestone. Consider the following dimensions:
- Enforcement risk: If the SOE is an empty shell – capitalised only to the extent of its project assets, with no independent revenue stream – a successful arbitration award against it may produce a piece of paper that cannot be satisfied. Awards against SOEs are only as useful as the assets available for execution.
- Sovereign immunity exposure: Even if the contractor succeeds in joining the state to proceedings, states routinely invoke jurisdictional and enforcement immunity. Under both the UN Convention on Jurisdictional Immunities of States and Their Property (2004) and the customary international law reflected in national statutes such as the UK State Immunity Act 1978, state property used for sovereign (non-commercial) purposes is protected from attachment. Procurement budgets, central bank reserves, and diplomatic assets are typically off-limits regardless of the merits of the claim.
- Contractual limitation periods: Both the arbitration clause and the governing law of the contract will determine the limitation period applicable to the payment claim. Missing that window – especially during months spent writing escalation letters to non-parties – can extinguish a meritorious claim.
- Reputational and commercial downstream effects: Infrastructure contractors in emerging markets often have ongoing or future project pipelines in the same country. The manner in which a dispute is pursued – including public filings and media coverage – can affect future procurement eligibility and bilateral relationships.
- Credit-insurance and assignment value: An unpaid receivable against a government counterparty, if properly documented and structured, may have value to specialist distressed-debt purchasers or may be covered (at least partially) by export credit insurance policies. This option disappears if the dispute is handled in a way that destroys the documentation trail.
The Legal Fork: Three Distinct Questions Before Any Action
1. Does the State Have Any Direct Legal Obligation?
The first and most important question is whether any instrument signed by the state – not the SOE – creates a binding payment or performance obligation. The instruments to scrutinise fall into several categories:
- Sovereign guarantee: A formal guarantee issued by a ministry of finance or treasury, typically countersigned by a public notary or registered with the attorney general's office, in which the state expressly undertakes to pay the SOE's obligations if the SOE defaults. This is the gold standard. It must be examined for the authority of the signatory, the scope of covered obligations, any conditions precedent to calling the guarantee (demand notice, cure period, certification of default), and whether any expiry date has passed.
- Letters of support or comfort letters: These are weaker instruments. A "letter of support" from a ministry typically expresses intent or policy without creating a legally enforceable payment obligation. Whether a comfort letter gives rise to contractual liability depends on its precise wording and the governing law. Courts and tribunals have repeatedly held that letters containing language such as "it is our policy to ensure" or "we intend to support" do not constitute guarantees. See, for example, the analysis of comfort letters under English law as reflected in Kleinwort Benson Ltd v Malaysia Mining Corporation Bhd [1989] 1 WLR 379 (Court of Appeal).
- Procurement law obligations: In some jurisdictions, public procurement legislation imposes obligations on the contracting authority (which may be a ministry, not the SOE) in connection with contracts executed through state entities. Brazilian federal procurement law, for instance, is governed by Lei nº 14.133/2021 (the new Public Procurement Law), which defines the contracting authority and its obligations. If the SOE acted as agent or delegate of a ministry rather than as a principal in its own right, arguments may exist that the ministry is the true contracting party.
- Project agreements and concession contracts: Large infrastructure projects frequently involve a layered structure: a concession agreement or project agreement between the state and the project company, and a separate engineering or construction contract between the project company and the contractor. The contractor's direct counterparty is the project company (or SOE), not the state. The state's obligations under the concession agreement – step-in rights, compensation on termination, force majeure payments – run to the project company, not to the contractor.
2. What Claim Exists Against the SOE, and by What Procedure?
Even if no sovereign remedy exists, the contractor retains its contractual claim against the SOE. The critical variables are:
- Arbitration clause: Does the contract provide for international arbitration (ICC, ICSID Additional Facility, UNCITRAL, or similar)? Or domestic arbitration in Brazil? Or litigation in Brazilian courts? This determines both the forum and the enforceability of any award or judgment in the jurisdiction where SOE assets might be found. Under the New York Convention on the Recognition and Enforcement of Foreign Arbitral Awards (1958), an award rendered in a contracting state is enforceable in any of the other 172 contracting states, subject to the limited grounds for refusal set out in Article V.
- SOE capacity to respond: Even if the SOE is technically solvent, its ability to pay may be constrained by budgetary controls. Brazilian SOEs operating under the Lei das Estatais (Lei nº 13.303/2016) are subject to federal oversight, and their payment obligations may require supplementary budgetary appropriations from the federal government. This does not negate the legal obligation but may affect the practical timeline for enforcement.
- Interim relief and asset preservation: Before or during arbitration, is it possible to seek interim attachment of SOE assets – bank accounts, receivables from other projects, real property? This depends on whether the arbitration clause permits emergency arbitrator relief, whether the courts of the seat or the place of enforcement have jurisdiction to grant conservatory measures, and whether applicable sovereign immunity rules extend to the SOE's assets. Domestic Brazilian courts have granted attachments against SOE assets in commercial disputes, but the procedural requirements are specific and the threshold for demonstrating fumus boni iuris and periculum in mora must be satisfied.
- Governing law: The law governing the contract determines the substantive rights: what constitutes a breach, what damages are recoverable, whether the contractor is entitled to interest, and the limitation period within which the claim must be brought.
3. Are There Commercial Alternatives to Adversarial Proceedings?
Arbitration against an SOE with limited liquid assets is expensive, slow, and uncertain at the enforcement stage. Before committing to that route, the contractor should assess whether commercial alternatives either replace or supplement the legal claim:
- Export credit insurance: If the contractor or its funders hold an export credit insurance policy (from a provider such as UK Export Finance, SACE, or Euler Hermes), a payment default by a sovereign or quasi-sovereign counterparty may be a covered event. Policy conditions vary, and the insurer's subrogation rights will affect the dispute strategy.
- Assignment to a distressed-debt fund: Specialised funds acquire receivables against sovereign and quasi-sovereign entities at a discount. The value of the receivable in a secondary market depends on the quality of the documentation (signed contract, payment certificates, demand notices) and the jurisdictional enforceability of the claim. A poorly documented or legally uncertain claim will command a very low price or none at all.
- Commercial negotiation and restructuring: Where the SOE's default is caused by a temporary budget suspension rather than insolvency, structured negotiations – potentially involving the ministry, the SOE, and local development banks – may produce a repayment schedule, in-kind compensation (for instance, rights to other project work), or a debt-for-equity arrangement. This approach requires a credible legal claim as leverage; it is not a substitute for establishing one.
- Bilateral investment treaty (BIT) claims: If the contractor is a foreign investor and the defaulting state is a party to a BIT with the investor's home state, an investment treaty arbitration claim may be available. This would require that the contractor qualifies as an "investor" under the treaty, that the investment meets the treaty's definition, and that the state's conduct constitutes a treaty breach (expropriation, fair and equitable treatment, full protection and security). BIT claims against Brazil are complicated by the fact that Brazil has not ratified the ICSID Convention; however, Brazil has signed a series of Cooperation and Facilitation Investment Agreements (CFIAs, known in Portuguese as ACFIs) with certain partner countries, some of which include investor–state dispute resolution mechanisms.
Sovereign Immunity: What It Does and Does Not Do
Sovereign immunity is the most commonly misunderstood element of these situations. It is frequently invoked as if it were an absolute shield, but modern international law distinguishes between immunity from jurisdiction (the right not to be sued in a foreign court without consent) and immunity from enforcement (the right to prevent execution against state assets). Both are limited by the commercial-activity exception.
Under the UN Convention on Jurisdictional Immunities of States and Their Property (adopted by the UN General Assembly in Resolution 59/38, 2004, though not yet in force as a universal treaty), a state cannot invoke jurisdictional immunity in proceedings relating to a commercial transaction entered into by the state. Critically, however, the convention also makes clear that a state enterprise or other entity established by the state which has an independent legal personality is to be treated as a separate entity, and its immunity (if any) is assessed independently.
What this means in practice is that the SOE's separate legal personality cuts both ways. It means the state is not automatically liable for the SOE's debts; but it also means that the SOE, to the extent it is engaged in commercial activity, cannot generally invoke the immunity from jurisdiction that the state itself might claim. The harder question is enforcement immunity: even if a contractor obtains an award against the SOE, attaching assets that are operationally necessary or that the state has designated for sovereign purposes may be resisted on immunity grounds.
Under the UK State Immunity Act 1978 (sections 3 and 13), a state body engaged in commercial transactions submits to jurisdiction in English courts for disputes arising from those transactions, but property in use or intended for use for commercial purposes is the threshold for execution. For SOEs incorporated under foreign law, English courts have analysed whether the entity is to be treated as the state itself or as a separate legal person – a fact-intensive inquiry that depends on the degree of control exercised by the state and the nature of the entity's functions.
Typical Mistakes and What Cannot Be Promised
In this type of situation, creditors commonly make several errors that complicate the eventual legal position:
- Treating the guarantee as self-executing: Even a formal sovereign guarantee usually requires a written demand, delivered to a specified address, within a specified period, certifying specific conditions. Sending informal letters to a ministry does not constitute a valid guarantee call if the guarantee specifies a different demand mechanism.
- Missing the arbitration notice period: Many construction contracts (including FIDIC-based contracts commonly used in infrastructure procurement) require a Notice of Dispute to be filed within a defined period after the event giving rise to the claim, failing which the right to arbitrate may be lost or the contractor may be treated as having accepted the SOE's position. This is a strict contractual obligation, not a default rule that courts routinely waive.
- Assuming state ownership equals state liability: As discussed, this is factually and legally incorrect in virtually every jurisdiction. Courts and tribunals do not pierce the corporate veil of an SOE simply because it is wholly state-owned, absent specific evidence of commingling, fraud, or undercapitalisation at the time of contracting.
- Initiating public pressure prematurely: Writing to the press or engaging political intermediaries before the legal position is clear can damage commercial relationships without providing any procedural advantage. It may also affect the contractor's standing in future procurement processes in the same market.
- Failing to preserve evidence: Project management systems, emails, payment certificate workflows, and site access logs may be hosted on servers controlled by the SOE or by third-party platforms accessible to the SOE. Early steps to preserve copies of all evidence in a jurisdiction outside the control of the opposing party are essential.
No adviser can promise that a sovereign guarantee – if one is found to exist – will be honoured without litigation, that an arbitration award against the SOE will be satisfied, or that sovereign assets will be available for execution. The analysis can identify the best available path; it cannot guarantee the outcome at any stage of proceedings.
If you are facing a similar situation – an SOE default on a substantial construction or infrastructure contract, with questions about state liability – early structured analysis is the most valuable step you can take. Contact us at info@ferrazwhitmore.com or visit our contacts page to discuss how we can help you map the legal terrain.
Documents and Evidence: What You Need Before Any Forum
The strength of any claim – whether against the SOE, the state, or an insurer – depends entirely on the quality of the documentation assembled. The following categories should be located, authenticated, and preserved immediately:
| Document category | Why it matters | Red flags to check |
|---|---|---|
| Signed contract (and all addenda) | Establishes governing law, dispute resolution clause, payment terms, milestone definitions | Unsigned annexes; oral amendments not reduced to writing; governing law clause referring to domestic courts only |
| Guarantee or comfort letter | Determines whether a binding state obligation exists and its conditions | Unsigned; signed by official without authority; expiry date already passed; language of "comfort" rather than "obligation" |
| Procurement documents (invitation to tender, award notice, government approvals) | Establishes whether ministry acted as contracting authority; supports any misrepresentation argument | Project described as "sovereign" in public docs but contract silent; discrepancy between tender and final contract |
| Payment certificates and engineer's determinations | Establishes the quantum of the claim and any agreed milestone completion | Certificates issued by SOE's own representative without independent engineer sign-off; disputed milestone definitions |
| Demand letters and SOE/ministry responses | Establishes the timeline of default and commencement of any limitation period | Letters sent to wrong address; no delivery confirmation; response from ministry characterised as "non-party" |
| SOE corporate documents (statutes, board resolutions, ownership structure) | Needed to assess separate legal personality, decision-making authority, and enforceability of any award | SOE dissolved or merged post-contract; assets transferred to a new entity |
| Project correspondence (emails, meeting minutes, site reports) | Supports the factual narrative of performance, variation, and suspension | Key communications on platforms controlled by the SOE; WhatsApp/informal channels not backed up |
Timeline and Cost Drivers
The timeline for recovering on a substantial SOE receivable is long by any realistic measure. The following phases and indicative durations apply to a scenario involving international commercial arbitration, though the precise timeline depends on the seat, institution, and complexity of the case:
- Pre-arbitration analysis and negotiation (months 1–4): Review of all documentation; legal opinion on guarantee scope and arbitration clause; structured demand to the SOE; parallel engagement with any insurer. This phase is relatively low in cost but high in strategic importance. Errors here are difficult to correct later.
- Commencement of arbitration to constitution of tribunal (months 4–8): Filing of request, payment of advance costs to the arbitral institution, nomination of arbitrators. Advance costs for a claim of this size under the ICC Rules will depend on the amount in dispute; the ICC's cost calculator (available on the ICC website) provides estimates based on the sums in dispute.
- Pleadings and document production (months 8–24): Exchange of statements of claim and defence, document production, witness statements. Cross-examination of witnesses familiar with government decision-making can be complex and contested.
- Hearing and award (months 24–36): Main evidentiary hearing; post-hearing briefs; tribunal deliberation; final award. For state-related disputes, challenges to jurisdiction by the SOE or the state (if joined) can extend this phase.
- Enforcement (months 36 onwards): Recognition proceedings in the jurisdiction where assets are located. If the SOE has assets in multiple jurisdictions, parallel enforcement proceedings may be required. Enforcement against Brazilian federal SOE assets in Brazil will involve the federal courts and may be subject to administrative payment procedures distinct from ordinary commercial enforcement.
The principal cost drivers are: the number of jurisdictions involved in enforcement; whether the state challenges jurisdiction (requiring a bifurcated jurisdictional phase); the volume of documentation to be reviewed and translated; and whether expert evidence (quantum, engineering, public procurement law) is required.
Decision Checklist
Before committing to any course of action, the following questions must be answered by reference to the actual documentation:
- Has a signed, formally executed sovereign guarantee been located? If yes, what are its conditions precedent and have they been satisfied?
- What is the governing law of the contract, and what limitation period does it impose on the payment claim?
- What dispute-resolution mechanism does the contract provide, and has the required notice of dispute been issued in time?
- Is the SOE a separate legal person under the law of its incorporation, and are its assets legally distinct from state assets?
- Does the contractor hold, or have access to, an export credit insurance policy that covers sovereign or quasi-sovereign default?
- Are there SOE assets in jurisdictions outside Brazil where enforcement of a foreign award would be straightforward (e.g., England and Wales, France, the Netherlands)?
- Has the contractor's home jurisdiction concluded a BIT or CFIA with Brazil that includes investor–state dispute resolution applicable to this investment?
- Have all project documents, emails, and payment records been preserved in a jurisdiction outside the SOE's control?
- Has local Brazilian public-law counsel been engaged to assess the SOE's status under Lei nº 13.303/2016 and the new procurement law (Lei nº 14.133/2021)?
- Has the contractor considered whether a structured commercial negotiation – with the support of a credible legal threat – might produce a faster outcome than full arbitration?
If you are working through these questions on a live situation involving an SOE default or a disputed government guarantee, Ferraz & Whitmore can help you structure the analysis and coordinate with licensed local counsel in the relevant jurisdictions. Write to us at info@ferrazwhitmore.com or visit our contacts page.
The Role of Advisory Coordination
Situations of this kind – where a large infrastructure receivable sits against a state-linked entity with uncertain liability – require coordination across several legal disciplines simultaneously. The documentary analysis of the guarantee is a contract-law and public-law question. The arbitration is an international commercial or investment question. The enforcement is a private international law and execution question. The insurance or assignment option is a structured-finance and regulatory question.
No single practitioner or practice group routinely commands all of these disciplines in depth. Advisory coordination – ensuring that the positions taken in the guarantee analysis are consistent with the positions taken in the arbitration, and that both are consistent with what is needed for enforcement – is therefore a critical function in its own right. Local Brazilian public-law counsel needs to work alongside international arbitration counsel; both need to understand the enforcement picture in the jurisdictions where the SOE may have assets.
Ferraz & Whitmore operates as an independent legal advisory firm and does not hold itself out as licensed to practise Brazilian, English, or any other domestic advocacy. Where matters require licensed local representation – in Brazilian federal courts, before English courts, or before an arbitral tribunal – we work alongside appropriately qualified and licensed practitioners. Our role is to structure the cross-jurisdictional analysis, identify the gaps, and ensure that the work of local counsel is integrated into a coherent strategy.
For a preliminary discussion of your situation, contact us at info@ferrazwhitmore.com or through our contacts page.
Sources
- UN Convention on Jurisdictional Immunities of States and Their Property (2004), UN Treaty Collection – supports analysis of sovereign immunity from jurisdiction and enforcement, and the separate legal personality of state entities; retrieved 2026
- State Immunity Act 1978 (UK), legislation.gov.uk – supports analysis of commercial-activity exception to immunity and English law treatment of foreign state entities; retrieved 2026
- New York Convention on the Recognition and Enforcement of Foreign Arbitral Awards (1958), newyorkconvention.org – supports enforceability of international arbitration awards in contracting states and grounds for refusal under Article V; retrieved 2026
- Lei nº 14.133/2021 (Lei de Licitações e Contratos Administrativos), Planalto.gov.br – supports analysis of Brazilian public procurement law and contracting authority obligations; retrieved 2026
- Lei nº 13.303/2016 (Lei das Estatais), Planalto.gov.br – supports analysis of legal status and governance of Brazilian state-owned enterprises; retrieved 2026
- UNCITRAL – New York Convention status and text, uncitral.un.org – supports enforceability framework for international arbitral awards; retrieved 2026
- ICC Rules of Arbitration (2021), ICC – supports reference to ICC arbitration procedure and cost structure; retrieved 2026
- Brazil CFIA (ACFI) model text, Ministry of Development, Industry, Commerce and Services (MDICE), Brazil – supports reference to Brazil's investment agreement framework and investor–state dispute resolution; retrieved 2026
- Kleinwort Benson Ltd v Malaysia Mining Corporation Bhd [1989] 1 WLR 379 – as reported through legislation.gov.uk and standard law reports – supports analysis of comfort letters versus guarantees under English law; retrieved 2026
Disclaimer: This article describes a model client situation for informational purposes only and does not constitute legal advice, nor does it reflect an actual Ferraz & Whitmore engagement or outcome. Legal routes are described as options, not guarantees. Applicable law, procedure and the right to provide a given service in each jurisdiction must be confirmed for any specific matter. Ferraz & Whitmore is an independent legal advisory firm based in Lisbon, Portugal; where local representation is required, it works with licensed local counsel. For advice on your situation, contact info@ferrazwhitmore.com.