When a single commercial transaction is documented across multiple contracts – each carrying its own dispute resolution clause – the breakdown of one obligation can trigger simultaneous proceedings in Paris, Istanbul and London before any party has had the chance to assess overall exposure. The practical challenge is not simply legal: it is strategic, financial and logistical, because each forum operates under its own procedural rules, its own timetable and its own evidentiary standards. Understanding where each claim lives, what interim protection is available in the jurisdiction where assets sit, and whether any mechanism exists to coordinate – or at least sequence – the proceedings is the starting point for any rational response.
The Recognisable Problem
International joint ventures in the construction, infrastructure and energy sectors routinely involve a layered suite of documents: a shareholders' agreement (SHA) or joint venture agreement governing the relationship between the equity participants; one or more supply or procurement contracts linking the project company to vendors or subcontractors; and security or guarantee instruments – bank guarantees, parent company guarantees or letters of credit – intended to backstop performance or payment obligations.
Each document is typically negotiated separately, often by different teams at different times. The dispute resolution clause in each reflects the preference – or the superior bargaining position – of the party that drafted it at that particular moment. The result is entirely foreseeable: the SHA mandates ICC arbitration seated in Paris; the supply contract refers disputes to ISTAC arbitration in Istanbul; and the guarantee instruments are governed by English law with English court jurisdiction.
When a payment default or project failure occurs, each party naturally commences proceedings in the forum most favourable to its position. The claimant under the SHA files a request for arbitration with the ICC in Paris. The supplier invokes the ISTAC rules in Istanbul. The guarantee beneficiary issues proceedings in the English High Court. Within weeks, the same underlying factual matrix – the same project, the same payment stream, the same allocation of responsibility – is being litigated simultaneously in three separate jurisdictions, before three different tribunals, under three different sets of procedural rules.
What Is Really at Stake
The risks generated by parallel proceedings extend well beyond the obvious burden of maintaining three legal teams in three cities. The specific dangers deserve careful attention:
- Contradictory findings of fact. Tribunal A in Paris may find, on the evidence before it, that the buyer's payment default was excused by a force majeure event. Tribunal B in Istanbul may reach the opposite conclusion on substantially identical evidence. Neither finding binds the other tribunal. The parties are then left with irreconcilable awards, neither of which provides a clear foundation for enforcement.
- Inconsistent interim measures. An emergency arbitrator in Paris may grant an asset-freezing order. The Istanbul tribunal may decline equivalent relief, or grant competing relief that cuts across the Paris order. The English High Court may issue its own injunction under s.44 of the Arbitration Act 1996. The cumulative effect can be practically unworkable.
- Duplication of evidence and expert costs. Each tribunal requires its own documentary record, its own factual and expert witnesses and its own hearing schedule. The same witnesses may be required to give evidence multiple times, in different languages, under different procedural frameworks. Translation, travel and preparation costs compound rapidly.
- Preclusion and estoppel risks. A finding made in one proceeding – even a preliminary or interlocutory finding – may be argued by the opposing party to give rise to issue estoppel or abuse of process arguments in another forum. Whether and to what extent such arguments succeed varies by jurisdiction, but the uncertainty itself imposes additional cost and strategic complexity.
- Enforcement exposure. An award that conflicts with a concurrent finding in another jurisdiction may face challenge at the enforcement stage under Article V of the New York Convention 1958, particularly on public policy grounds, if the enforcing court concludes that the award is irreconcilable with another binding decision on the same subject matter.
- Budget collapse. Experience in complex multi-forum disputes suggests that the aggregate cost of defending or prosecuting three concurrent sets of proceedings can exceed several multiples of what a single consolidated proceeding would cost. For a mid-size company or fund, this arithmetic alone can be dispositive.
If you are facing the early stages of this kind of multi-forum problem and wish to understand the document review that should precede any strategic decision, the checklist in this article is a useful starting point. You are also welcome to write to info@ferrazwhitmore.com with a brief outline of your situation.
The Legal Fork: Applicable Law, Procedural Rules and Jurisdiction
Three Forums, Three Procedural Universes
ICC arbitration, Paris seat. Proceedings are governed by the ICC Rules of Arbitration (2021 version in current force). The seat determines the lex arbitri – the supervisory law of the arbitration – which for a Paris seat is French arbitration law, primarily Book IV of the Code de procédure civile. The ICC Court in Paris administers the reference but does not itself decide the merits. The ICC Rules contain provisions on consolidation (Article 10) and joinder of additional parties (Article 7), but these mechanisms operate only within ICC proceedings and require consent or a finding that the additional party is prima facie bound by the same arbitration agreement.
ISTAC arbitration, Istanbul seat. ISTAC (the Istanbul Arbitration Centre) administers proceedings under its own Arbitration Rules. Turkey is a party to the New York Convention, having ratified it in 1992, and Turkish arbitration law is codified in the International Arbitration Law No. 4686 of 2001 (for international arbitrations) and in the Civil Procedure Code (HMK) for domestic matters. The ISTAC Rules contain their own provisions on emergency arbitration, consolidation and interim measures, which differ in detail from the ICC Rules.
English High Court jurisdiction (guarantees). Where the guarantee instruments confer jurisdiction on the English courts, proceedings are governed by the Civil Procedure Rules 1998 (CPR) and fall under the supervisory jurisdiction of the Business and Property Courts, typically the Commercial Court or King's Bench Division. English law governs both the substance of the guarantee and the procedural conduct of the litigation. The English court has broad powers to grant interim relief, including freezing injunctions (formerly Mareva injunctions) under s.37 of the Senior Courts Act 1981, which may extend to assets located outside England and Wales in appropriate circumstances.
The Fundamental Problem: Arbitration Clauses Do Not Merge Automatically
Perhaps the most important thing to understand at the outset is that separate arbitration clauses in separate contracts do not consolidate themselves simply because the underlying dispute arises from the same commercial relationship or transaction. Each clause is a separate agreement to arbitrate, binding only the parties to that contract, in respect of disputes arising under that contract, before the tribunal specified in that contract.
Attempts to compel consolidation across separate arbitration agreements face significant doctrinal obstacles. The principle of separability means that each arbitration agreement is treated as autonomous from the main contract in which it appears, and by extension as autonomous from every other arbitration agreement. Unless all relevant parties have expressly agreed to consolidation – either in the original contracts, in a subsequent procedural protocol, or through the applicable institutional rules – each tribunal has jurisdiction only over the claims properly before it.
Article 10 of the ICC Rules 2021 permits the ICC Court to consolidate two or more ICC arbitrations, but only where all parties agree, or where all claims arise under the same arbitration agreement, or where the arbitration agreements are compatible and the claims arise from the same legal relationship or related transactions. Where one proceeding is ICC and another is ISTAC and a third is before the English court, Article 10 simply does not apply to the ISTAC or court proceedings.
Key Forks in the Road
The analysis of any multi-forum situation typically reaches a series of decision points, each of which affects all subsequent strategy:
- Fork 1: Is any of the dispute resolution clauses invalid or unenforceable? An asymmetric or unclear clause may be challengeable. A clause that purports to bind a party that did not sign the containing contract may be resisted. If one of the three clauses is defective, that forum may fall away, simplifying the picture.
- Fork 2: Can any of the proceedings be stayed? The English court has jurisdiction under s.9 of the Arbitration Act 1996 to stay court proceedings where there is a valid arbitration agreement covering the dispute. Where the guarantee proceedings are in the English courts rather than arbitration, one party may apply to stay those proceedings pending the outcome of the arbitrations, or argue that the guarantee claim is ancillary to the arbitral claims and should await their resolution.
- Fork 3: Is there scope for a voluntary procedural protocol? Where the parties are still capable of engaging commercially – and this is not always the case once litigation has commenced – a negotiated procedural protocol can synchronise timelines, establish a common document production process, share expert appointments, and agree on the sequencing of proceedings. Such protocols require the consent of all parties and all tribunals, but they are not unprecedented in complex multi-party, multi-contract disputes.
- Fork 4: Where are the assets, and what interim protection is urgently needed? The choice of forum for interim measures should be driven by asset location, not by the merits forum. A party with assets in England should consider English freezing relief even if the merits dispute is in Paris. A party with assets in Turkey should consider whether Turkish courts can grant precautionary attachment (ihtiyati haciz) under the Turkish Enforcement and Bankruptcy Law (İcra ve İflas Kanunu, No. 2004) in support of the Istanbul arbitration or as a free-standing precautionary measure.
- Fork 5: Is global settlement commercially viable? A settlement umbrella that resolves all three sets of proceedings simultaneously – documented by a single settlement agreement under a chosen governing law with a single enforcement mechanism – is frequently the most efficient outcome. It requires all parties to all three proceedings to participate, which is a significant coordination challenge, but it eliminates the risk of contradictory awards and avoids the enforcement lottery.
Realistic Routes and Their Trade-offs
Route A: Defend Each Proceeding Independently
The most common initial response is to appoint separate counsel in each forum and defend each proceeding on its own terms. This is the path of least resistance and requires no cooperation from the opposing party. Its disadvantages are substantial: cost multiplies; facts are presented inconsistently across forums because different counsel make different strategic choices about emphasis; and the risk of contradictory findings is unmanaged. This route is rational only where the claims in each forum are genuinely distinct and there is no material overlap in the underlying factual matrix.
Route B: Obligation-by-Obligation Forum Mapping
Before any substantive response is filed, it is worth conducting a disciplined mapping exercise. Each contractual obligation in dispute is identified and allocated to the forum with jurisdiction over it. The overlap between claims is charted. The question is then whether any claim has been filed in the wrong forum – for instance, whether a claim nominally brought under the supply contract in Istanbul actually arises from obligations governed by the SHA and therefore belongs in Paris. Where a party has commenced proceedings in a forum that lacks jurisdiction over the specific claim it has brought, an early jurisdictional challenge may be effective and cost-efficient.
The forum map also identifies gaps: obligations that are in dispute but have not yet been the subject of proceedings in any forum, and in respect of which the limitation clock may be running.
Route C: Negotiated Procedural Protocol
Where the parties retain a degree of commercial relationship and all three proceedings are at an early stage, a voluntary procedural protocol is worth exploring. Such a protocol might: agree a common discovery/document production process so that each party produces its documents once to a shared depository; appoint shared experts on technical questions (construction quality, valuation); synchronise hearing dates to minimise witness availability conflicts; and agree that findings of fact in one proceeding are binding or at least admissible in the others. The protocol does not consolidate the proceedings – they remain legally separate – but it rationalises their conduct. Each tribunal must consent to the protocol, and institutional rules must be consulted to confirm that the tribunal has authority to adopt it.
Route D: Stay Applications and Anti-Suit Injunctions
In appropriate circumstances, a party may apply to one tribunal or court for relief that suspends or restrains proceedings in another forum. The English court has historically been willing to grant anti-suit injunctions restraining a party from pursuing foreign arbitral or court proceedings in breach of an English jurisdiction or arbitration agreement, though such relief is exercised with care in relation to arbitral proceedings to avoid interference with the jurisdiction of the other tribunal. The power derives from the court's inherent jurisdiction and s.37 of the Senior Courts Act 1981.
Within the EU, the position is complicated by the CJEU's jurisprudence. Following West Tankers (Case C-185/07, 2009), English courts sitting in EU proceedings have been constrained in granting anti-suit injunctions against proceedings in EU member state courts. Post-Brexit, the interaction between English courts and EU member state courts in this context has changed, and the position should be assessed carefully by reference to current English authority and the specific procedural posture of the case.
Route E: Settlement Umbrella
A global settlement capturing all three forums simultaneously offers the cleanest resolution of the multiplicity problem. Practically, it requires a lead negotiator or mediator with access to all parties across all proceedings. The settlement agreement itself should: identify each set of proceedings; include a full release of claims arising from the same subject matter across all forums; specify the governing law of the settlement; select a single enforcement forum; and include a mechanism for the withdrawal or discontinuance of each live proceeding. The choice of governing law for the settlement agreement is itself a strategic decision: English law is frequently chosen for its certainty and the depth of its commercial contract jurisprudence.
If you would like to discuss the preliminary steps involved in coordinating a cross-forum review of this kind, Ferraz & Whitmore can be reached at info@ferrazwhitmore.com or via our contacts page.
Typical Mistakes and What Cannot Be Promised
Common Errors in Multi-Forum Situations
- Filing responses without a consolidated fact binder. Where facts will be presented across three forums, inconsistency is the primary risk. The same event – a delayed shipment, a disputed inspection report, a board resolution – must be characterised consistently across all pleadings. Teams operating in isolation without a shared master chronology routinely create contradictions that opposing counsel exploit.
- Treating each proceeding as the primary proceeding. In a multi-forum situation, each set of proceedings has a different risk profile and a different function. The ICC arbitration in Paris may be the highest-value claim but the slowest to resolve. The ISTAC arbitration may move faster but on a narrower set of issues. The English guarantee proceedings may offer the most effective interim relief but the smallest damages. Strategy requires a portfolio view, not independent optimisation of each forum.
- Ignoring limitation periods in dormant forums. While three sets of proceedings are running in parallel, it is easy to lose sight of a potential counterclaim or additional claim that has not yet been filed. Limitation periods continue to run. The applicable limitation period differs by jurisdiction and by the governing law of the relevant obligation. Identifying all potential claims and ensuring they are protected before they prescribe is an early priority.
- Conflating the merits forum with the interim relief forum. The tribunal with jurisdiction over the merits of a dispute is not necessarily the most effective forum for urgent interim protection of assets. Where assets are located in a third country not covered by any of the three primary forums, an application to that country's courts for precautionary relief – in support of the arbitral proceedings, under the domestic law implementing the New York Convention – may be both available and essential.
- Assuming consolidation is achievable without consent. Parties sometimes assume that because the underlying commercial situation is interconnected, a court or tribunal will impose consolidation. Outside the specific circumstances addressed by institutional rules (and subject to any applicable national arbitration law provisions), consolidation without consent is very difficult to achieve and should not be relied upon as a primary strategy.
What Cannot Be Promised
No adviser can promise a consistent outcome across three independently constituted tribunals applying different procedural rules and potentially different governing laws. Even with the most rigorous coordination of a party's presentation across all forums, each tribunal reaches its own conclusions. The risk of contradictory findings is real and cannot be eliminated by strategy alone – it can only be managed, mitigated or resolved through settlement.
Similarly, no adviser can promise that an anti-suit injunction will be granted, that a stay application will succeed, or that a voluntary procedural protocol will be accepted by all parties. Each of these outcomes depends on the specific facts, the procedural posture of the proceedings and the composition of the relevant tribunal or court.
Documents and Evidence
The Document Review Checklist
Before any strategic decision can be taken, the full document suite must be reviewed. The following list reflects the minimum scope of that review in a situation of this type:
- All transaction documents: the SHA or JV agreement in its executed form, including all schedules and side letters; the supply contract(s) with all amendments; the guarantee instruments, whether bank guarantees, parent company guarantees or letters of credit; any framework or umbrella agreement if one exists.
- Dispute resolution clauses: each clause extracted and compared side by side, identifying the seat, the institution, the governing law of the arbitration agreement, the number of arbitrators, the language of the proceedings, and any multi-tier requirements (negotiation, mediation before arbitration).
- Dispute notices: every notice of dispute, request for arbitration, claim form or letter before action that has been issued or received, with dates and the forum in which it was filed.
- Procedural documents: any responses, statements of defence, procedural orders, terms of reference (in ICC proceedings), or case management directions already issued by any tribunal or court.
- Governing law analysis: the governing law of each substantive contract and of each arbitration agreement (which may differ); whether any mandatory law overrides apply (e.g., Turkish mandatory law for contracts performed in Turkey).
- Asset map: the location, nature and approximate value of assets held by each party in each jurisdiction, including bank accounts, real property, receivables, shares in project companies, equipment and intellectual property.
- Corporate structure: the full ownership and corporate structure of each contracting party, to identify whether group companies above or below the contracting entity hold assets that might be available for enforcement.
- Payment and performance records: all invoices, payment confirmations, delivery records, inspection reports, and correspondence relating to the disputed payment or performance obligation.
- Communications: all material communications between the parties (email, formal correspondence, meeting minutes) relating to the events that triggered the dispute, including any without-prejudice or privileged communications that must be separately protected.
Timeline and Cost Drivers
Indicative Procedural Timelines
Precise timelines depend on the rules of each institution, the complexity of the case and the composition of the tribunal. The following general observations are drawn from the publicly available procedural rules of the relevant institutions and courts:
| Forum | Governing Rules | Approximate Time to Final Award / Judgment | Emergency / Interim Relief |
|---|---|---|---|
| ICC arbitration, Paris seat | ICC Rules 2021 | Typically 18–36 months from request to final award in complex cases; expedited procedure available for claims below the threshold set in Appendix VI of the ICC Rules | Emergency arbitrator within 15 days of application under Art. 29 ICC Rules 2021 |
| ISTAC arbitration, Istanbul seat | ISTAC Arbitration Rules | Variable; ISTAC rules provide for an expedited procedure; complex cases typically 12–30 months | Emergency arbitrator procedure available under ISTAC Rules |
| English High Court (Commercial Court) | CPR 1998; Commercial Court Guide | Summary judgment applications possible within months; full trial typically 18–36 months from issue depending on complexity and listing | Without-notice freezing injunction available on urgent application; return date typically within days |
Primary Cost Drivers
In a three-forum situation, cost is driven by factors that do not arise in a single-forum dispute:
- Duplication of counsel. Each forum requires specialist local counsel familiar with that institution's rules and practice. Coordinating three sets of counsel across Paris, Istanbul and London adds a layer of project management cost that is often underestimated at the outset.
- Translation. Documents that are relevant across all three proceedings must be translated into the language of each forum. In a construction dispute with substantial technical documentation, translation costs can be material.
- Expert evidence. Where technical experts (construction, engineering, valuation, quantum) are needed, each tribunal may require its own expert appointment, with separate reports and cross-examination. Sharing experts across proceedings is possible in principle but requires the consent of all parties and tribunals.
- Arbitrator and institutional fees. ICC arbitrator fees are calculated on the basis of the amount in dispute under the ICC scale (Schedule of Costs in Appendix III of the ICC Rules 2021). ISTAC fees are calculated under the ISTAC fee schedule. These fees are independent of legal costs and accrue in each proceeding.
- Management time. The internal cost of management bandwidth consumed by three concurrent proceedings – instructing solicitors, reviewing documents, preparing witnesses, attending hearings – is frequently the largest single cost item and the least often budgeted for in advance.
Decision Checklist
The following checklist is intended to help general counsel or in-house legal teams structure their initial response to a multi-forum dispute of this type. It is not legal advice and does not substitute for analysis of the specific facts and applicable law.
- Step 1 – Freeze the document record. Issue a litigation hold immediately to all custodians of potentially relevant documents. Ensure that automatic deletion policies are suspended. This applies in all three jurisdictions.
- Step 2 – Extract and compare all dispute resolution clauses. Read each clause carefully. Identify the seat, the institution, the governing law of the arbitration, any notice requirements and any multi-tier prerequisites. Assess whether each proceeding commenced so far has been commenced correctly and in the right forum.
- Step 3 – Map the obligations and claims. For each obligation in dispute, identify which contract governs it and which forum has jurisdiction. Identify claims that have been filed in the wrong forum. Identify claims that have not yet been filed but should be.
- Step 4 – Assess interim relief urgency. Is there an asset preservation issue that requires urgent action before the merits can be addressed? If so, identify where the relevant assets are located and what relief is available in that jurisdiction – independently of the merits forum.
- Step 5 – Review limitation exposure. For each potential claim not yet filed, assess the applicable limitation period under the governing law of the relevant obligation. Ensure that all viable claims are protected before they prescribe.
- Step 6 – Assess consolidation and coordination options. Review the institutional rules of each forum for consolidation, joinder and procedural coordination mechanisms. Assess whether a voluntary procedural protocol is commercially feasible. Assess whether a stay or anti-suit application is appropriate.
- Step 7 – Build a consolidated fact binder. Establish a single master chronology, a single document repository, and a single set of factual propositions that will be presented consistently across all three forums. Assign responsibility for maintaining consistency to a single coordinating counsel or team.
- Step 8 – Model the budget. Prepare a realistic cost model for each of the realistic routes, including the cost of running all three proceedings to a final determination versus the cost of settlement at different stages. The budget model should include external legal costs, arbitrator fees, expert costs, translation and management time.
- Step 9 – Consider global settlement. Even if settlement is not currently viable, identify the conditions under which it might become so. Keep the settlement option open by maintaining communications with the opposing party at an appropriate level, without prejudice to the conduct of the proceedings.
- Step 10 – Appoint coordinating advisory support. Where the in-house team does not have the capacity to coordinate three concurrent international proceedings, appoint a coordinating adviser with cross-border dispute experience to maintain the portfolio view and manage the interface between local counsel teams.
Ferraz & Whitmore advises on the structure and coordination of cross-border dispute portfolios of this kind. For an initial discussion of how the analysis in this article applies to your situation, please write to info@ferrazwhitmore.com or visit our contacts page.
Sources
- ICC Rules of Arbitration 2021 – ICC institutional rules governing consolidation (Art. 10), joinder (Art. 7), emergency arbitrator (Art. 29) and costs (Appendix III, Appendix VI), retrieved 2026
- ISTAC Arbitration Rules – Rules of the Istanbul Arbitration Centre governing proceedings seated in Istanbul, including emergency arbitrator and expedited procedure provisions, retrieved 2026
- Arbitration Act 1996 (UK) – ss. 9 (stay of court proceedings), 44 (court powers in support of arbitration), applicable to English-seated arbitrations and to English court proceedings where arbitration agreements are invoked, retrieved 2026
- Senior Courts Act 1981, s. 37 (UK) – Statutory basis for English court jurisdiction to grant injunctions, including freezing injunctions (Mareva relief) in support of foreign and domestic proceedings, retrieved 2026
- Civil Procedure Rules 1998 (UK) – Procedural framework for English High Court litigation including Commercial Court proceedings, retrieved 2026
- CJEU, Case C-185/07, Allianz SpA v West Tankers Inc [2009] – Leading EU authority on the limits of anti-suit injunctions in the context of EU member state court proceedings, retrieved 2026
- New York Convention on the Recognition and Enforcement of Foreign Arbitral Awards 1958 (UNCITRAL) – Art. V grounds for refusal of recognition and enforcement, including public policy (Art. V(2)(b)); basis for enforcement of awards across contracting states including Turkey, France and the UK, retrieved 2026
- Turkish International Arbitration Law No. 4686 of 2001 – Governing law for international arbitrations seated in Turkey, retrieved 2026
- Turkish Enforcement and Bankruptcy Law (İcra ve İflas Kanunu) No. 2004 – Basis for precautionary attachment (ihtiyati haciz) in Turkey in support of arbitral and court proceedings, retrieved 2026
- EU Regulation 1215/2012 (Brussels I Recast) – Jurisdictional rules for civil and commercial matters within EU member states; relevant to French court supervisory jurisdiction over Paris-seated ICC arbitrations, retrieved 2026
Disclaimer: This article describes a model client situation for informational purposes only and does not constitute legal advice, nor does it reflect an actual Ferraz & Whitmore engagement or outcome. Legal routes are described as options, not guarantees. Applicable law, procedure and the right to provide a given service in each jurisdiction must be confirmed for any specific matter. Ferraz & Whitmore is an independent legal advisory firm based in Lisbon, Portugal; where local representation is required, it works with licensed local counsel. For advice on your situation, contact info@ferrazwhitmore.com.